Rear Spar Riveting, ER Tank Z Brackets

Today was another great day in the shop. Lots of rivets, lots of ER tank planning and work. As you’ll see, I committed to doing the tanks, so there’s no turning back now. (Yes there is.)

Let’s dig into the pictures. I started by clecoing together the rear spar channel, reinforcement bars, and plates.

More of the reinforcement fork.

Then, the riveting started.

Nice shop heads.

Slowly, I made my way inboard (left to right in this picture).

Reinforcement rivets. AN470AD4-6s.

A few minutes later…

I put clecos where I am not supposed to put any rivets yet.

After removing the clecos…

Inboard part of the left spar.

Then I moved to the riveting I could do at this mid-span reinforcement plate. There’s only 5 rivets you can set right now.

Upsidedown shot of the middle reinforcement plate.

And without the clecos….it looks like I didn’t do anything.

The middle reinforcement plate.

Same story on the outboard end.

Outboard part of the left rear spar.

I found a good spot for the rear spars.

I found a good storage spot for them…

Apparently I got distracted with the second spar and didn’t take any pictures. Oh well. It’s also sitting on the wing stand supports just like its brother.

I decided at this point I needed to make a final decision about ordering an extra set of tank stuff to duplicate the inboard tanks into the outboard position. Before committing, I decided to cleco together the left tank skin, baffle, and z-brackets, then set it on the spar (with all the wing skins clecoed into position to keep the main spar straight.

Tank skin, sitting in an outboard spot.

Then, I decided to see how aligned I could get the tank skin and wing skins. Here’s the lower side of the left wing.

Just verifying that the outboard edge lines up with the wing skin outboard edge.

And the upper surface of the left wing.

Here’s the top side, also aligned.

I stood back to take an overview picture. Maybe it’s just nerves, but I hesitated about starting to make holes in metal here.

Another shot of the top of the left wing, with a left tank in an outboard position.

I guess if I’m going to do this I need to take the next step. In this case, it would be to make the inboard z-bracket. From a few days ago (https://rv8build.com/2026/07/03/tiedowns-er-tank-planning-devinyling-wing-skins/), I had some 6061 – T6 Z channel that is 1 1/8 by 1 1/8 instead of 1 1/8 x 5/8.

Van’s z-bracket on the right, my stock on the left.

Here’s an action shot of me matchdrilling the new from the old.

This way the holes will be perfectly transferred.

And here is the new z-bracket clecoed to a left tank skin.

I’m holding the old one up for clarification.

Next, I set the tank back in it’s perfectly-aligned position, and verified that the new z-bracket prevents any interference with the tiedown bracket.

Looks like good clearance from here.

After removing the tiedown bracket, the aligned larger z-bracket looks like it’s going to work perfectly.

This is the last step before committing.

So, I clecoed on the rest of the z-brackets, and put some double-sided tape on the spar side of all of them.

This was tedious.

Next, I set the tank skin, baffle, and z-brackets (with double-sided tape) onto the left main spar, then removed the 14 clecos shown here.

I’m about to remove these clecos.

After removing the clecos and lifting the skin and baffle off… I’m left with z-brackets, taped to the outboard half of the spar in final position.

Z-bracket positioning for the outboard tank.

Whoa, the inboard z-bracket is exactly touching the tiedown bracket. I think I’m going to trim that back a little. (The tiedown, not the z-bracket).

Like a glove.

This picture is of the RIGHT main spar after drilling the left spar, hanging the right skins, then repeating the alignment exercise on the right ER tank.

Lots of z-brackets now drilled to the outboard halves of the two spars.

I stopped here on the spars, because any more drilling really requires the skins to be fully clecoed to the spars and ribs, which aren’t prepped yet.

But, by 3/8-19 tap arrived!

It’s tool day!

So I got both tiedown brackets tapped. Wuhoo!

Those are some nice threads, I mean toes.

Huge day today. 112 rivets. 4.0 total. 1 hours on the spars, 3.0 hours on the extended range tanks.