Tonight, a quick night in the shop just to start knocking off last items off the empennage checklist.
I wasn’t happy with the trailing edge bends on the elevator, so I fabricated a couple wooden blocks as Vans describes in section 5 of the manual, and squeezed very carefully to fix my in adequate trailing edge bends.
Before:

After:

Happy about these now. What’s next?
0.5 hours.