I am vehemently against kids on the internet (pretty much in any form) but I caught 2/3 of my kids peeling blue vinyl off my completed left ER tank in its cradle.
I’m incredibly proud of them for 1000 reasons, one of which is their “I want to help dad with this cool project” attitude.

Alright (wipes happy dad tears), let’s get to work.
I looked around for something small to do, I am not ready yet to close up the right ER tank, so I riveted on the 5 nutplates for the fuel sender.
I am covering up the one bad rivet with my angle. I really don’t want you to see that one. Bad enough to hide, not bad enough to drill out.

Next, let’s get the right ER tank fuel sender out and do some wire bending. A little measure-bend-measure-bend, and I had a PERFECT float sender geometry.


I also riveted on the access panel nutplate strip, so there were 27 rivets there.

Plus 10 for the nutplates on the sender hole and 2 for the anti-rotation bracket. Is that 39 total rivets?
A very quick 0.5 hours.