I didn’t really plan a big day in the shop today, but I mixed up some proseal and ended up getting 6 ribs done in 2 batches.
For the first batch, I mixed up just over 1.5 oz of proseal (with about 0.15 oz of black stuff) and got to sealing the three outermost interior ribs. After getting those riveted, I took a break and grabbed this picture of the topside of the right ER tank.

I guess you needed a picture of my pants. Here are my pants.

After a short break (for actual real work), I got back out and got the two remaining interior ribs and the outboard rib, picture on the left here.

3.0 hours. 216 Rivets. 34 each on the inboard ribs, 43 on the outboard rib, and three for the nose reinforcement bracket on the outboard rib.
I’m enjoying your build log a lot.
We’re building an RV-8 as well, still working on the empennage.
We’re about 60 mi south of you so if you want to stop by and help you’d be welcome. 🙂
Heck yeah, let’s get together! I’ll email you!