I started assembling the horizontal front spar today. Different from the RV-7, Vans has added two reinforcement plates to the aft side of the spar channels with a LOT of rivets in them.

Here’s a look at the shop heads.

I need a NAPA trip soon for new self-etching primer.
2.0 hours of prep, priming, and riveting.